Wednesday, December 8, 2010

Work on the final slab...

These are the columns being raised for the final slab ..


fixing the staircase on site


view of the living and the dining room of the ground floor unit,

view of the bedroom in the ground floor unit..

looking into the kitchen area from the dining space of the ground floor unit..

The living and the dining space again with the puja room towards the right..

the lower level of bhujji's unit.. view from the main door..

View from the dining space looking at the living room the kitchen space..

The staircase area which will connect the two levels..

Kitchen area leading to the utility..

columns on the final floor..


No comments:

Post a Comment