Wednesday, December 8, 2010

Work on the final slab...

These are the columns being raised for the final slab ..


fixing the staircase on site


view of the living and the dining room of the ground floor unit,

view of the bedroom in the ground floor unit..

looking into the kitchen area from the dining space of the ground floor unit..

The living and the dining space again with the puja room towards the right..

the lower level of bhujji's unit.. view from the main door..

View from the dining space looking at the living room the kitchen space..

The staircase area which will connect the two levels..

Kitchen area leading to the utility..

columns on the final floor..


Unit for Captain and Family

This is the unit for Capt and family. The layout is similar to that of Sonny's unit. In this case, we've worked out 4 different furniture for the bedroom level. One will be the diagonal mirror or what has been shown as Sonny's bedroom level and the other 3 options are here.



Unit for Abhi and family

These are the plans with the furniture layouts for Abhi's unit. We've done two options for the bedroom level.


Tuesday, December 7, 2010

Bhujji's unit - Option2 for bedroom layout

This is another option for the bedroom level layout for Bhujji's unit. You can take a look at both the options and decide or suggest alternates. I'll then work out the electrical drawings accordingly.

Sonny and Family's unit

These are the furniture layout plans for Sonny's unit. The layout on the first level is similar to Bhujji's unit but on the mid level where you have the 2nd bedroom is different.

Monday, December 6, 2010

Raj Bharatur and family's unit.

I'm posting the first cut of the furniture layout for Bhujji's unit. Please go through this and suggest changes if any because the position of windows and electrical layouts will depend on that. 


Sunday, October 10, 2010

Work on the second floor

 the view from the road
 the parking area..
 this is the staircase area between the two units..
 the ground floor unit, the walls have been completed the ceiling is being prepared for the plastering.

 the form work being removed for the first floor
 columns being cast on the second floor...






Sunday, August 15, 2010

Casting of ground floor slab and work on the first floor.

I'm updating the progress on site since the last blog. The ground floor slab has been cast, the centering for the 2nd slab is about to start and the walls and columns on the 1st floor are being done. I'm putting up some of the snaps from site during this sequence.
Centering for the ground floor roof in progress.




Form work for the roof complete.

The slab after being cast and the new columns for the first floor being raised and the centering being removed on the ground level.

The block work for the first floor in progress.